Section of Insurgentes Boulevard closed for pipe replacement

Section of Insurgentes Boulevard closed for pipe replacement


 Tijuana, July 24. Due to corrective maintenance work on the Insurgentes collector, the Tijuana State Public Services Commission (CESPT) closed a section of Insurgentes Boulevard in the Cerro Colorado neighborhood.

In a 15-meter section between Campos and Del Seminario avenues, 50 meters of this 36-inch pipeline will be replaced; the rehabilitation of this infrastructure includes 300 meters of pipe. 

The partial closure is in the lane next to the median strip, in the direction of the Río Zone-Monte de los Olivos.

The work will be carried out over 15 days, so those traveling in the area are urged to drive with caution and use alternate routes.

Post a Comment

Previous Post Next Post

KALISSIA (PERFECT PRODUCTS REALM) is a Big Wide Range & Variety Shopping 🛍️🛒🛍️ Site 👉 Click Now Shopping Start